BEGIN:VCALENDAR
VERSION:2.0
METHOD:PUBLISH
CALSCALE:GREGORIAN
PRODID:-//WordPress - MECv7.30.0//EN
X-ORIGINAL-URL:https://www.domlec.dm/
X-WR-CALNAME:Dominica Electricity Services
X-WR-CALDESC:DOMLEC
X-WR-TIMEZONE:America/Dominica
BEGIN:VTIMEZONE
TZID:America/Dominica
X-LIC-LOCATION:America/Dominica
BEGIN:STANDARD
TZOFFSETFROM:-0400
TZOFFSETTO:-0400
TZNAME:AST
DTSTART:20260501T092553
END:STANDARD
END:VTIMEZONE
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-PUBLISHED-TTL:PT1H
X-MS-OLK-FORCEINSPECTOROPEN:TRUE
BEGIN:VEVENT
CLASS:PUBLIC
UID:MEC-b6cda17abb967ed28ec9610137aa45f7@domlec.dm
DTSTART;TZID=America/Dominica:20231126T090000
DTEND;TZID=America/Dominica:20231126T170000
DTSTAMP:20231124T124740Z
CREATED:20231124
LAST-MODIFIED:20231124
PRIORITY:5
SEQUENCE:0
TRANSP:OPAQUE
SUMMARY:Planned Power Interruption Notice
DESCRIPTION:Date:   Sunday 26th November, 2023\nTime:  9:00 a.m. – 5:00 p.m.\nArea: Upper Hillsborough Street and Upper River Bank to the  intersection of Independence Street, Independence Street, Upper Lane, River Street, River Bank (between Independence Street and Hanover Street), Kings Lane, Fields Lane, Great Marlborough Street, Great George Street, Hanover Street, Virgin Lane (between Independence street and Bath Road), King George V Street (between Bath Road and Independence Street), Boyds Avenue, and Cork Street (between Bath Road and Independence Street) \nReason: To allow DOMLEC to undertake maintenance works on the high voltage switching devices on King George V Street and Bath Road.\n
URL:https://www.domlec.dm/events/planned-power-interruption-notice-226/
CATEGORIES:Outages
END:VEVENT
END:VCALENDAR
